6Making it real

September. The module is live; the practical is in week two. Now every piece has to exist on the day.

The questionThe module has been rebuilt and the arrangements agreed. What has to occur, and who has to do it, for each to exist when the learner reaches it?
What to read
A good decision looks like

Every line has an owner, a date, and a check, and the associate dean holds the list. The captions are reviewed against the transcript by a person, not only generated, because a caption track with the wrong hazard class is worse than none. The timer is confirmed off in the live module by the unit’s designer, with a screenshot in the file. The rebuilt activity is retested with a screen reader after the platform’s September update. The interpreter is booked through the office for the practical and for the safety briefing that precedes it, with the procedure sheet sent a week ahead. The technicians have the brief, have walked through it with the unit’s designer, and know who to call if something in the room does not work. The associate dean reports the laboratory’s audible-only alarm to facilities as a barrier with a date, and an interim arrangement for the practical is agreed with the technicians in the meantime.

In week one the associate dean’s office checks with the access office that each learner has what was agreed, in one message that asks about the arrangements and nothing about the people. An arrangement that is recorded and not delivered has discharged nothing (source 11), and the professional standards for a disability service expect the service and the units it works with to evaluate whether what was approved occurred (source 12).